Project Overview

The Bandirma-Bursa-Yenisehir-Osmaneli High Standard Railway Line will follow the Gursu and Yenisehir corridor and connect to the Ankara-Istanbul High Speed Train line through the junction line to be built in the Osmaneli area, integrating Bursa into the high-speed rail network. The line will also extend west of Bursa through the TEKNOSAB and Karacabey stations to Balikesir, thereby enabling a railway connection between Bursa and Balikesir.

Within the Scope of the Project

201 km railway line including superstructure, electromechanical and signaling works
29 tunnels with a total length of 35.7 km
7 stations
15 viaducts with a total length of 8.3 km
35 bridges with a total length of 5,383 meters
99 underpasses with a total length of 1.45 km
Work under the project is progressing rapidly.

Once completed:
30 million
annual passenger capacity
59 million tons
freight carrying capacity will be available on the line
2 h 15 min
travel time between Ankara and Bursa
1 h 15 min
travel time between Istanbul and Bursa